How the case was worked through

Why the £250 cap is the weakest argument

Section 20 of the Landlord and Tenant Act 1985 requires a landlord to consult before carrying out qualifying works where the contribution of any one leaseholder will exceed £250, and before entering a qualifying long-term agreement costing any one leaseholder more than £100 in a twelve month accounting period. The consultation runs in stages, with notices, a period for written observations, and estimates.

Where the landlord fails to consult, recovery is capped at those figures. That is the rule the leaseholders had read about, and it is accurately stated. What is usually left out is the next step.

A landlord can apply to the First-tier Tribunal for dispensation from the consultation requirements, and the tribunal’s focus is on whether the leaseholders suffered actual prejudice as a result of the failure, rather than on punishing the breach itself. Where the works genuinely needed doing and the price was reasonable, dispensation is commonly granted, often on terms. A procedural failure, on its own, rarely converts an £18,600 bill into a £250 one.

Telling a group of worried leaseholders that the argument they were counting on is the one least likely to work is not a comfortable start. It is better than letting them spend fourteen months believing it.

Here the freeholder had served a notice of intention but never served the estimates stage notice. The consultation was defective, and the freeholder applied for dispensation. It was granted. What it was granted subject to mattered more than whether it was granted, and that is where the case actually turned.

What did work

Four lines of challenge were run, and three of them produced something.

The first was the eighteen month rule. Section 20B provides that costs incurred more than eighteen months before a service charge demand cannot be recovered, unless the leaseholder was notified in writing within that period that the costs had been incurred and would be demanded. Reviewing the invoices against the correspondence showed that a block of professional fees and preliminary works fell outside the window, with no qualifying notice having been given. Those came out of the demand entirely.

The second was reasonableness. Service charges are recoverable only to the extent that they are reasonably incurred and the works are of a reasonable standard. This is not an argument that the leaseholders would have preferred a cheaper contractor. It requires evidence, which in practice means a surveyor. Ours identified scope that duplicated work already carried out under an earlier programme, and a management fee calculated as a percentage of a figure that already included the managing agent’s own costs.

The third was the landlord’s legal costs. Many leases allow a landlord to recover the costs of tribunal proceedings through the service charge, which can mean winning your case and then paying for the other side’s lawyers anyway. Section 20C allows a leaseholder to apply for an order that those costs are not treated as relevant costs. That application was made at the outset rather than as an afterthought, and it was granted.

The fourth line went nowhere. The buildings insurance premium looked high, and the leaseholders were convinced there was a commission arrangement behind it. There may well have been. Without disclosure they could not prove it, and the tribunal deals in evidence rather than suspicion. It was dropped, which was the right decision and did not feel like one.

The insurance point is the one they still raise. It is very likely they were right. Being right and being able to prove it are different things, and a case is built out of the second.

The outcome

The tribunal determined a reduction of roughly 27%, taking the demand from £18,600 to about £13,550 per flat. The section 20C order meant the freeholder’s legal costs did not come back through the following year’s accounts. The process took fourteen months from first instruction to determination.

Nobody was thrilled. The leaseholders still had to find £13,550 each for works to a building that was nine years old, and the reduction did not touch the underlying problem, which is that their annual service charge had more than doubled in six years and the structure producing that has not changed.

Two further things are worth recording, because they are the parts people do not anticipate. The determination benefited every leaseholder in the block on the charges in issue, including the seventy-seven who did not participate and did not contribute to the costs. And one leaseholder had to abandon a sale during the proceedings, because a buyer’s solicitor quite reasonably declined to proceed with an unresolved tribunal application disclosed on the property information form.

On the reforms, which have not arrived

Every leaseholder in this group had read that the law was changing, and several had wondered whether to wait.

The Leasehold and Freehold Reform Act 2024 received Royal Assent in May 2024 and contains significant service charge transparency provisions, including standardised demands and better information about planned works. Most of it requires commencement regulations, and it is not in force. The government indicated in April 2026 that the 2024 Act contains flaws it intends to correct through the substantive Commonhold and Leasehold Reform Bill, which effectively couples the two, so the 2024 Act is unlikely to be implemented until that Bill passes. A draft Bill was published on 27 January 2026 and further parliamentary stages were expected later in 2026.

The practical position for anyone holding a demand today is therefore straightforward. The law that applies is the law described above, and waiting for reform is not a strategy, particularly where the eighteen month rule is running.